Chronology
Chronologies
This article indexes a collection of extracts from the Safety Investigation Report MH370/01/2018 which have been selected because they contain various chronologies..
Each extract is on a separate sub-page linked from the list of topics or titles below. Each event in these chronologies has been linked to a Timeline Event in the main Timeline articles on this site. This provides a cross-link or check on the well known events. (The Timeline includes other events not included in these chronologies).
Actions Taken on Saturday 8 March
The document ACTIONS TAKEN BETWEEN 01:38 AND 06:14 ON SATURDAY 8 MARCH was released by the Ministry of Transport (Malaysia) on Tuesday, 1 April 2014.
List of Extracts containing Chronologies
Note: To avoid repetition, all extracts are sourced from the Safety Investigation Report MH370/01/2018 unless otherwise stated.
- History of the Flight (MH370)
Source: 1.1 History of the Flight 1.1.1 Introduction - Radar Observations
Source: 1.1 History of the Flight 1.1.3 Diversion from Filed Flight Plan Route - SATCOM 'Handshakes'
Source: Table 1.9B - SATCOM ‘Handshakes’ - Chronology of Satellite Communications Ground Station Logs
Source: Table 1.9C - Chronology of Satellite Communications Ground Station Logs - Chronology of ATC Activities after Notification by HCM ACC
Source: Table 1.18E – ATC Activities after Notification by HCM ACC - Chronology of ATC Events before the Disappearance of Flight MH370
Source: Table 2.2A - Chronology of ATC Events before the Disappearance of Flight MH370 - Chronology of ATC Events following the Disappearance of MH370
Source: Table 2.2C Chronology of ATC Events following the Disappearance of MH370 - Direct line communication exchanges relating to MH370:-
- Between KL ACC Planning Controller and HCM ACC
Source: Table 2.2F - Direct Line Communication Exchanges between KL ACC and HCM ACC - Between KL ACC and Singapore ACC
Source: Table 2.2G - Direct Line Communication Exchanges between KL ACC and Singapore ACC - Between KL ACC Radar Controller and HCM ACC
Source: Table 2.2H - Direct Line Communication Exchanges between KL ACC Radar Controller and HCM ACC - Between KL ACC and ODC
Source: Table 2.2I - Direct Line Communications Exchanges between KL ACC and ODC
- Between KL ACC Planning Controller and HCM ACC